New Boardwalks Proposed for Imnavait Creek in 2004

 

These are the final cut (hopefully). Please provide comment through verbal description (e-mail)

or by modifying the images in Photoshop and e-mailing them back to me.

This page last modified on March 9, 2004 9:44 AM

fnawb@uaf.edu

 

1) From the materials site to the Imnavait Creek Weir

 

 

2) At watertracks 7 & 8

 

 

3) At watertrack 20 (2 images - A & B)

 

A) Initial layout

 

B) Additional Site Information