|
Letter to the Editor |
||||
|
I sent
my parents an e-mail the other day letting them know when I'd be home from
Christmas. The e-mail said:
"Dear Parental Units, ETA is two weeks and counting." This is
the response I got from my Dad: "DEAR
PARENTAL UNIT SPAWN SUBUNIT (A), Parental
Unit (A) hopes that Parental Unit Spawn Subunit (A) is operating at acceptable
parameters? P.U.(A) hopes that all function is within specified tolerances? Is
P.U.S.Subunit(A) power intake sufficient? Is
P.U.S.Subunit(A) input of data at the Major Main Core Reprogram Center occurring
within specified time frames? Hopefully the input data is useful to the future
Existence Function Maintenance Programs of P.U.S.Subunit(A). P.U.(A)
is aware of the time frame of P.U.S.Subunit(A) arrival at the home site. The
Parental Unit(s) and perhaps Parental Unit Spawn Subunit (B) will be at the
arrival location to assist you with cargo mobility, transport and to direct
P.U.S.Subunit(A) to the domicile, if the Locator Subprograms of P.U.S.Subunit(A)
have been overwritten at the Major Main Core Reprogram Center. P.U.(A) & (B)
and P.U.S.Subunit(B) will be renewed by the download of data from
P.U.S.Subunit(A). This should be a major shared data link. P.U.(A)
must cease transfer of data, at this specific time. P.U.(A) must hasten to
accomplish all assigned tasks within specified time frames. P.U.(A) will attempt
data link with P.U.S.Subunit(A) at another unspecified time. Logically, PARENTAL
UNIT (A)" |
|
|||
Sun
Star Newspaper • P.O. Box 756640 • Fairbanks, Alaska 99775
fystar@uaf.edu • editorial (907) 474-6039
• advertising (907) 474-5078