Multiple MAUs in Sponsored Programs
For
proposed projects that involve more than one Major Adminstrative Unit (UAF, UAA,
or UAS) use the following guidelines:
- An
MAU cannot be a subaward in another MAU's proposal.
The UA System is considered one organization with a
single accounting system and therefore does not have
an internal subaward mechanism.
- The
prime MAU should use their F&A
rate for the entire proposal, unless a non-lead
MAU constitutes 10% or greater of the total project
activity. However, sponsor guidelines and requirements
are the primary consideration in deciding if it
is appropriate to use multiple rates.
- The
proposal budget should combine all line items for the
MAUs involved, with separate MTDC lines for each MAU's
F&A recovery.
- Wherever
possible, a separate spreadsheet budget for each MAU
and a combined budget should be included to show the
breakdown of work and funds requested.
- For
NSF proposals, the easiest and most compliant solution
is to prepare a collaborative dual submission: each
MAU's budget is entered separately, the proposals are
linked in FastLane, and awards are made to each MAU
separately for their portion of work.
- UAF proposals that have faculty or staff from another MAU require a signed routing form approved by the respective MAU's Office of Sponsored Programs.
|
All photos by Todd Paris.
Contact:
UAF Office of Sponsored Programs
West Ridge Research BLDG Suite 212
902 Koyukuk Drive
P.O. Box 757270
Fairbanks, AK 99775-7270
Phone: 907.474.6000
Fax: 907.474.5444
email: fyosp@uaf.edu
OSP Staff Directory |
|