Director - Charles "Chilkoot" Ward 474-5608 fncbw@uaf.edu
Power Plant Superintendent - Mike Setterberg 474-7091
| Mailing Address: |
Physical Address: |
| P.O. Box 757420 |
802 Alumni Drive |
| Fairbanks, Alaska 99775-7420 |
Fairbanks, Alaska 99775 |
|
|
Our mission is to provide high quality uninterrupted service of water, power and heat and chilled water. This mission is
accomplished through a commitment to preventive maintenance, planning, and inspection.
|
Division Summary
|
The Utilities Division operates a combined heat and power plant that provides electric power, steam heat, domestic water, and
district-chilled water to campus. The power plant has a peak load of 9 MW and a power generating capacity of 23 MW. Two coal
fired and two oil fired boilers generate the steam that powers the three steam turbines. After the steam goes through the turbine,
it is used to heat the campus buildings, and power the absorption chillers for campus cooling. The power plant also has a 9.6MW
backup diesel generator. The Utilities Division is progressive in its approach to modernization and energy saving efforts. The
power plant was built in 1964 and is in the process of continually being upgraded.
The University operates its own water treatment plant that produces over 87 million gallons of safe drinking water per year.
The two primary and one emergency well are housed in heated and security alarmed buildings. High purity water to various labs is
also produced.
|
SNAP (Sustainable Natural Alternative Power) (437KB PDF) - Connecting producers and purchasers of renewable energy
Utility Rates FY08
History of the Power Plant
Telephone / Network Communications
UAF Parking Lot Head Bolt Outlet Schedule
Water Treatment Plant
Staff Directory
Current Information:
Chiller Statistics
Turbine Generator #3
Weekly Report (Excel format)
|